Power cost

Convert site electricity into a $/compute-hour line. Cite benchmarks.

kW × PUE × $/kWh  =  $/compute-hour (power)

Worked numbers

Two A100 80GB at 400 W each = 0.80 kW GPU. Host + NIC ≈ 0.20 kW. Board draw 1.00 kW.

inputvaluecite
Board draw1.00 kWnameplate
PUE1.4PUE
High-cost power$0.18 / kWhCAISO-like band on EIA industrial
Mid power$0.082 / kWhEIA industrial
Low-cost power$0.050 / kWhHydro / surplus
profileformula$/compute-hour
High1.00 × 1.4 × 0.18$0.252
Mid1.00 × 1.4 × 0.082$0.115
Low1.00 × 1.4 × 0.050$0.070

Utilization scales this line. A box that is powered but idle still pays PUE × kW. If you only rest asks 5 of 24 hours, either shut the box down or treat idle power as overhead on the hours you do sell — see spare capacity.